Semi Urban Water Distribution System
a)    Drilling of Borehole


b)    Construction of borehole main valve chamber and supply valve chambers

 

c)    Construction of 18Mtrs tank and tower foundation and erection.

d)    Construction of GENSET house

e)    Trench excavation for pipe layering to the water kiosks

f)    Pipe layering and backfilling

g)    Construction of water Kiosks

h)    System performance testing

i)    Commissioning of the project.