Dual Solar Pump System Installation
a)    Analysis of Borehole Test Performance and borehole records

b)    Trenching for column foundation for  tank tower.

c)    Setting of columns.

d)    Mounting the pressed steel tank tower.

e)    Construction Platform for Indian Mark II and the four or two Way Taps Stand.

f)    Installation of Dual/ Solar submersible pump & hand pump.

g)    Installation and fitting of all water valves and piping network.

h)    Installation of Solar Panels and Accessories.

i)    System performance testing.

j)    Commissioning of the project.