Drilling and equipping of boreholes
a)    Setting the drilling rig on the drill site

b)    Actual drilling using Rotary DTH Technology or mud drilling

c)    Casing of borehole depending on the clients requirements

d)    Installation of gravel filter packs; 2-4mm.

e)    Development of the borehole as per requirement of the project/ client.


f)    Chlorination

g)    Borehole Test Performance as required.

h)    Installation of Hand pump or Submersible pump

i)    Construction of Platform or Concrete slab for the pump head

j)    Commissioning of the project